Ask three studios what a one-minute architectural film costs and the answers can differ by a factor of ten. As with stills, that spread is not a market that cannot agree on a price. It is several different products sold under the same name — and a film multiplies every difference between them, because it is not one image but about eighteen hundred.
What a finished minute costs
Published guides put a finished minute of architectural animation at roughly US$2,000 to US$15,000 and up, or about US$50 to US$200 a second (Maverick Frame, 2026). An older guide splits it by quality: around US$4,000–US$10,000 a minute for standard work and US$15,000 or more for full HD, with offshore freelancers far below that at a far lower level of assurance (CADCrowd).
Most of those guides come from US studios, in US dollars, and many studios publish no film rates at all, which is part of why the numbers are hard to compare.
Our own architectural films start at $6,500 + GST per finished minute, quoted at a fixed price before any work starts. See what is included.
Why a minute is the honest unit
A minute of film at 30 frames a second is roughly 1,800 rendered frames, and every one of them has to be lit, rendered and graded like a still. That is why film is priced per finished minute rather than per project: it is the unit the work actually scales with, and it means you are not paying for padding.
It is also why length matters less than people expect. The scene, the materials and the lighting are built once; the minute is what renders them over and over. Cutting a film from 120 seconds to 90 saves rendering, but it does not halve the cost.
What drives the number
- Modelling and context. A single house on a quiet street is a fraction of a tower in a dense block. If the surrounding streets have to be built accurately, that is real hours — and a film shows far more of the surroundings than a still does.
- Photorealism. Light, materials and reflections done properly are what separate a film people watch from one they skip. They are also where the hours go.
- Interiors. Moving through rooms means furnishing, styling and lighting every one the camera passes, not just the hero corner a still would frame.
- Lighting states. Day only is the baseline. A dusk sequence, or a day-to-night transition, adds a second lighting setup and a second render.
- Things that move. People, cars, water, trees in the wind. Each one has to be animated and rendered convincingly, and badly animated figures are the fastest way to cheapen a film.
- Camera work. A few long, considered moves cost less and usually look better than many short cuts.
- Changes after approval. The single biggest avoidable cost. A change to the design after the animatic means re-rendering every shot it touches.
- Deliverables. Resolution (4K is the sensible standard now, 8K where the film will be shown very large), frame rate, sound design, a licensed music track, social cutdowns and titles all belong in the quote rather than appearing afterwards.
How long should it be?
For most developments, about ninety seconds. Sixty works for social-first campaigns, and six- to thirty-second cutdowns from the same footage cover the platforms buyers actually scroll. Past two minutes, a film loses its audience unless it is doing real narrative work — a sequence through a building that genuinely needs explaining.
If a brief asks for three minutes, it is worth asking what the extra ninety seconds have to show. And if the real question is film or tour, walkthrough, flythrough or 360° tour compares them.
Where the money goes in a good film
- Storyboard. Every shot planned on paper: where the camera starts, where it goes, what it lingers on and why.
- Animatic. A rough, fast-rendered version of the whole film with the real camera moves and timing. This is the approval that matters: changing a shot here is cheap; changing it after final rendering is not.
- Production. Materials, styling, landscape and figures go on, and the final frames render.
- Grade, sound and edit. Colour grade, sound design, a licensed score, titles, and the cutdowns.
A studio that skips the animatic is asking you to approve a film you have not seen moving.
How to keep the cost down without making it worse
- Build once. If you are commissioning stills, commission the film from the same scene. The model and materials are the expensive part, and they serve both.
- Lock the design first. Film is the worst place to discover a change.
- Approve the animatic properly. Have everyone who will comment watch it, and send one consolidated set of notes.
- Fewer, better shots. One slow move through the main living space usually does more than six quick ones.
- Ask for the cutdowns up front. Social edits cut from the main film cost little; the same edits ordered later can mean re-rendering.
Licensing the music in Australia
Music in a film is not a formality. In Australia, using a track needs two permissions: the composer’s for the song itself, usually through a music publisher, and the record label’s for the recording.
Production music is the simple route. It is written and recorded to be synchronised to film and video, and APRA AMCOS licenses it for productions including advertisements and websites, charged per use. A commercial track means asking the publisher and the label separately.
So ask which kind of music the quote includes, and where the licence lets the film be shown, from the sales suite and the website to social channels and paid advertising. Our film quotes include a licensed score.
Sources, checked October 2026: APRA AMCOS, Production music.
What a good film quote includes
A fixed price per finished minute and a total; the length; resolution and frame rate; the storyboard and animatic stages and the revision rounds at each; the lighting states; the sound and music licence; the cutdowns and formats; and a delivery date. If any of those are missing, the number you have been quoted is a starting point rather than a price.
See what our architectural film includes and how it is priced, or read what an off-the-plan campaign actually needs from its imagery. If you have a film in mind, send us the drawings and a sentence about where it will be shown.